DLC17Detail DLC-17
SS304 Pipe Fitting

SS304 Pipe Fitting

SS304 elbows, tees, reducers and flanges to complete the stainless secondary loop.

Family
Direct Liquid Cooling & Secondary Loop Support
Make
Tsingshan / Mech
Lead time
60 days
Projects
On request

How it works

Butt-weld fittings and weld-neck flanges matched to the pipe schedule keep a continuous stainless system with no dissimilar metals in contact with the coolant.

Role in the system

  1. 1.Completes the stainless loop
  2. 2.Matched to pipe schedule
  3. 3.No dissimilar metals in the coolant path

Supplied to

Project references for this item are shared on request with your quotation.

Include in your quotation request

  • Fitting types and sizes (DN)
  • Schedule to match pipe
  • Flange standard and rating
  • Quantity

This checklist is filled into the quotation form for you. Leave blank what you don't know yet.