M-101 · DLC-17

SS304 Pipe Fitting
SS304 elbows, tees, reducers and flanges to complete the stainless secondary loop.
- Family
- Direct Liquid Cooling & Secondary Loop Support
- Make
- Tsingshan / Mech
- Lead time
- 60 days
- Projects
- On request
How it works
Butt-weld fittings and weld-neck flanges matched to the pipe schedule keep a continuous stainless system with no dissimilar metals in contact with the coolant.
Role in the system
- 1.Completes the stainless loop
- 2.Matched to pipe schedule
- 3.No dissimilar metals in the coolant path
Supplied to
Project references for this item are shared on request with your quotation.
Include in your quotation request
- Fitting types and sizes (DN)
- Schedule to match pipe
- Flange standard and rating
- Quantity
This checklist is filled into the quotation form for you. Leave blank what you don't know yet.
Open the pre-filled quotation form


